What we make
- 3+2+1 sofa set frames: As a full set or as single pieces.
- Armchair frames: The single seat of a set, or a model of its own.
- Modern frames: Straight lines, slim arms, clean bodies.
- Classic frames: Curved arms and legs; carved models have their own page.
Ready for the upholsterer
A frame should cause no trouble once it reaches the upholstery line. Every frame is checked for dimensions and symmetry, and every production batch is compared with the approved sample, so there is no re-cutting or re-fitting at the upholstery stage.
Materials and joinery
| Load-bearing parts | Solid beech and hornbeam |
|---|---|
| Panels | MDF and plywood (back panels, seat boards and other non-load-bearing surfaces) |
| Joinery | Dowels, mortise and tenon, glue, screws and staples, chosen for the load on each joint. Details |
| Dimensions | No standard sizes imposed: seat height, depth and width are built to your drawing. |
| Quality control | Every frame checked for dimensions and symmetry; production runs checked against the approved sample |
| Minimum order | None: from a single sample to full production |
| Packing | Stretch film and cardboard |
What we need for a quote
- A drawing, or photos from the front, side and back
- Width, depth and height of each piece
- Seat height and arm height
- Quantity and target date
Please tell us whether your dimensions are for the finished, upholstered piece or for the bare frame. How to measure
Lead times
| Job | Lead time |
|---|---|
| Existing sofa model | 15 working days |
| New sofa design (from drawing) | 30–40 working days |
| Standard chair | 7–15 working days |
| New chair design | 15–30 working days |
The exact lead time is confirmed in writing once dimensions and drawings are final.
Frequently asked
Do you make frames for other furniture brands?
Yes. Vosso builds frames for furniture makers and brands to their own drawings and dimensions. Your design is never shown or sold to anyone else.
What is the lead time for a 3+2+1 sofa set frame?
15 working days for an existing model, 30–40 working days for a new design from a drawing. The exact date is confirmed in writing once the dimensions are final.
Is there a minimum order?
No. We build anything from a single sample to full production runs.